| Valuation | Address | Contractor | Description | Issued |
| $212.0M |
7100 CONNECTICUT AVE ↗ |
— |
Customer Wants To Use ePlans,Is a single BLD, the building is non-high rise and is of TYPE 1A construction, which is not |
2026-08-26 |
| $4.6M |
12116 ARBIE RD ↗ |
— |
Customer Wants To Use ePlans,INSTALLATION OF 28 MODULES - ROOF MOUNTED - 11.480 kW DC, 10.640 kW AC w/ MPU |
2026-09-04 |
| $4.6M |
11160 VEIRS MILL RD ↗ |
— |
Customer Wants To Use ePlans,Tenant Fit out for a Bowling & Redemption Arcade with a bar and snack bar and support a |
2026-09-10 |
| $4.0M |
9200 KENTSDALE DR ↗ |
— |
Customer Wants To Use ePlans,This project is for the new construction of a 3 story building for the Church's Parish Cent |
2026-08-26 |
| $3.8M |
7506 SAWGRASS TER ↗ |
— |
Customer Wants To Use ePlans,Install of 26 Roof Mounted Solar Panels 11.700 KW DC |
2026-09-04 |
| $3.7M |
1403 STATESIDE DR ↗ |
— |
Customer Wants To Use ePlans,Install of 26 Roof Mounted Solar Panels 11.700 KW DC UPGRADE EXISTING METER WITH NEW 200A M |
2026-09-08 |
| $3.1M |
15004 BUTTERCHURN LN ↗ |
— |
Build (1) Geogrid-reinforced modular block retaining wall using the Keystone Compact III near vertical wall system. The |
2026-09-02 |
| $2.9M |
20420 CENTURY BLVD ↗ |
— |
Customer Wants To Use ePlans,Scope includes interior alteration of a 17,414 s.f. vacant tenant space into a new Day Care |
2026-08-19 |
| $2.5M |
14 PINEY MEETINGHOUSE CT ↗ |
— |
Installation of 4 Carbon Fiber Straps, and 4 IntelliBraces. |
2026-08-19 |
| $2.2M |
1400 FOREST GLEN RD ↗ |
— |
Customer Wants To Use ePlans Interior work only,Interior renovation project is on the 5th floor of the Holy Cross Physic |
2026-09-14 |